Skip to main content
ADJUST FONT SIZE:  RESET
   Jobs   Links   Departments   Contact Us
Palm Beach County Logo
Search
Water Utilities
  • Water UtilitiesCurrently selected
    • Home
    • Customer Service
      • Bill Payment Options
      • Open an Account
      • Residential Rates
      • Non-Residential Rates
      • About Us
      • Holiday Schedule
      • Policies and Procedures
    • I Want To
      • Pay my Bill
      • Perform a Lien Search
      • Access Developer Information
      • Apply for a Hydrant Meter
      • Learn about Pretreatment
      • Learn about Backflow Prevention
      • Learn about Reclaimed Water
      • Learn About Dental Amalgam
      • Learn about Our Wetlands
    • AMI Information
      • AMI
      • Frequently Asked Questions
    • Water Quality
    • Contact Us Form
    • Access Your Account
    • Bids
    • Media
      • Press Releases
      • Multimedia

Publications and Documents


Page Content
  • (Blank)
    • WUD 14-037 - Runyon Village Water and Wastewater System Improvements
    • WUD 15-098B - Sanitary Sewer Collection System Rehab Phase 2
    • WUD 15-102 - Phase 2 Water Main Replacement at Belvedere Road and Turnpike
    • WUD 15-102 - Water Distribution System Improvements Wynnewood Acres
    • WUD 15-102 Water Distribution System Improvements Phase 2 Lake Belvedere Estates
    • WUD 17-022 - SRWRF Secondary Clarifier and Effluent Filtration Improvements
    • WUD 17-062 - Reclaimed Water Main Extension Under the Florida Turnpike
    • WUD 18-005 - WTP11 HSP Electrical Building Improvements
    • WUD 18-016 - WTP 9 VFD and Grounding Improvement
    • WUD 18-032R - Lift Station Continuing Contract 2018 Signed
    • WUD 18-045
    • WUD 18-046 - SROC SRWRF Deep Injection Well Testing
    • WUD 18-051 System-wide Wellfield Improvements
    • WUD 18-069 - Continuing Contract for Wastewater Gravity Lines and Manhole Rehabilitation
    • WUD 19-007 - Integrated Utility Master Plan
    • WUD 19-028 - CIP Program Management
    • WUD 19-028 - CIP Program Management Readvertisement
    • WUD 19-032 - Mechanical Integrity Testing of WRNWWTP WRWWTP Deep Injection Wells
    • WUD 19-040 - Pipeline Continuing Construction
    • WUD 19-076 - Water Treatment and Water Resources Engineering Services
    • WUD 19-077 General Utility, Architectural and Value Engineering Services
    • WUD 19-078 Wastewater Engineering Services
    • WUD 19-079 Utility Hydrogeologic Engineering Services
    • WUD 19-080 Electrical Instrumentation and Telemetry Engineering Services
    • WUD 19-081 Surveying and Mapping Services
    • WUD 19-082 Utility Distribution and Collection System Engineering Services
    • WUD 19-083 Emergency and Disaster Mitigation and Recovery Engineering
  • 1. Customer Service
    • 2017 Holiday Schedule
    • Auto Debit Form Fillable - January 19
    • Boil Water Instructions
    • Customer Service Pledge
    • Nonresidential Application
    • Non-Residential Application Fillable - January 2019
    • Nonresidential Rates
    • Non-Residential Rates Effective October 2017
    • Residential Application
    • Residential Application Fillable - January 2019
    • Residential Rates
    • Residential Rates Effective October 2017
    • Service Area Map
    • Welcome Brochure
  • 2. Water Quality Reports
    • 2018CCR
    • GladesCCR2018
  • 3. Finance Reports
    • 2012 Finance Report
    • 2013 Finance Report
    • 2014 Finance Report
    • 2015 Finance Report
    • 2016 Financial Report
    • 2017 Finance Report
    • 2018 PBCWUD Financial Report
  • 4. Policies
    • CH1
    • CH2
    • CH3
    • CH4
    • CH5
    • CH6
    • CH7
    • CH8
    • Concurrency
    • Customer Service Policy and Procedures
    • Minimum Design Standards
    • Uniform Policy and Procedures
    • UPAP
    • UPAP Chapter 1
  • 5. Other
    • Boil Water Instructions
    • Chlorine Flush January 2017
    • Hydrant Meter Application
    • Hydrant Meter Application 2018
    • Hydrant Meter Form (October2019)
    • Hydrant Meter WROC 2018
    • HydrantMeterApplication2019
    • HydrantMeterForm2019
    • HydrantMeterFormGlades2019
    • NonResRatesFY19
    • Press Release - Stormwater 6.13.2017
    • ResRatesFY19
    • Strategic Plan
    • UCRF
  • 6. Minimum Design Standards
    • Approved Materials and Equipment List January 2017
    • Approved Materials and Equipment List Summary of Revisions June 2019
    • Approved Materials and Equipment Summary of Revisions January 2017
    • Equipment Data Sheet
    • Equipment Data Sheet (2019)
    • Min Design Const STDS Table of Contents
    • PBC Equipment Data Sheet Spec Section
    • Potable Water Design Individual Details (January 2017)
    • Potable Water Design Individual Standard Details July 2019
    • Potable Water Design Standards (January 2017)
    • Potable Water Design Standards and Details Summary of Revisions (January 2017)
    • Potable Water Design Standards and Details Summary of Revisions July 2019
    • Potable Water Design Standards July 2019
    • Potable Water Standard Details Listing July 2019
    • Potable Water System Details Exhibit Listing (January 2017)
    • Project Completion Requirements (July 2019)
    • Project Submittal, Approval and Pre-Construction Requirements (July 2019)
    • Reclaimed Water Design Details - Exhibits (October 2016)
    • Reclaimed Water Design Individual Standard Details (July 2019 )
    • Reclaimed Water Design Standards (July 2019)
    • Reclaimed Water Design Standards (October 2016)
    • Reclaimed Water Design Standards and Details Summary of Revisions (July 2019)
    • Reclaimed Water Standard Details Listing (July 2019)
    • Reclaimed Water Summary of Revisions (October 2016)
    • Record Information (February 2016)
    • Section 1 - Materials and Equipment List June 2019
    • Specific Wastewater Lift Station Details Summary of Revisions (July 2019)
    • Wastewater Design Details - Exhibits (October 2016)
    • Wastewater Design Individual Details (December 2016)
    • Wastewater Design Individual Details (October 2016 REV)
    • Wastewater Design Individual Standard Details (July 2019 )
    • Wastewater Design Standard Details Listing (July 2019 )
    • Wastewater Design Standards (July 2019)
    • Wastewater Design Standards (October 2016)
    • Wastewater Design Standards and Details Summary of Revisions July 2019
    • Wastewater Summary of Revisions (October 2016)
    • WUD 2015 STD DTL SHT- LIFT STATION - LS_E-1 (PDF)
    • WUD 2015 STD DTL SHT- LIFT STATION - LS_E-2 (PDF)
    • WUD 2015 STD DTL SHT- LIFT STATION - LS_E-3 (PDF)
    • WUD 2015 STD DTL SHT- LIFT STATION - LS_M-1 (PDF)
    • WUD 2015 STD DTL SHT- LIFT STATION - LS_M-2 (PDF)
    • WUD 2015 STD DTL SHT- LIFT STATION - LS_RTU_E-4 (PDF)
    • WUD 2015 STD DTL SHT- POTABLE WATER - PWS-1
    • WUD 2015 STD DTL SHT- POTABLE WATER - PWS-2
    • WUD 2015 STD DTL SHT- POTABLE WATER - PWS-3
    • WUD 2015 STD DTL SHT- POTABLE WATER - PWS-4
    • WUD 2015 STD DTL SHT- RECLAIMED WATER - RW-1 (PDF)
    • WUD 2015 STD DTL SHT- RECLAIMED WATER - RW-2 (PDF)
    • WUD 2015 STD DTL SHT- RECLAIMED WATER - RW-3 (PDF)
    • WUD 2015 STD DTL SHT- RECLAIMED WATER - RW-4 (PDF)
    • WUD 2015 STD DTL SHT- RECLAIMED WATER - RW-5 (PDF)
    • WUD 2015 STD DTL SHT- WASTEWATER - WW-1 (PDF)
    • WUD 2015 STD DTL SHT- WASTEWATER - WW-2 (PDF)
    • WUD 2015 STD DTL SHT- WASTEWATER - WW-3 (PDF)
    • WUD 2015 STD DTL SHT- WASTEWATER - WW-4 (PDF)
    • WUD 2015 STD DTL SHT- WASTEWATER - WW-5 (PDF)
    • WUD 2015 STD DTLS - LIFT STATION (ACAD 2010)
    • WUD 2015 STD DTLS - LIFT STATION (ACAD 2013)
    • WUD 2015 STD DTLS - POTABLE WATER (ACAD 2010)
    • WUD 2015 STD DTLS - POTABLE WATER (ACAD 2013)
    • WUD 2015 STD DTLS - RECLAIMED WATER (ACAD 2013)
    • WUD 2015 STD DTLS - WASTEWATER (ACAD 2010)
    • WUD 2015 STD DTLS - WASTEWATER (ACAD 2013)
    • WUD 2015 STD DTLS - RECLAIMED WATER (ACAD 2010)
    • WUD 2019 STD DTLS - LIFT STATION (6 SHTS)
    • WUD 2019 STD DTLS - LIFT STATION ELEC E-1
    • WUD 2019 STD DTLS - LIFT STATION ELEC E-2
    • WUD 2019 STD DTLS - LIFT STATION ELEC E-3
    • WUD 2019 STD DTLS - LIFT STATION ELEC E-4
    • WUD 2019 STD DTLS - LIFT STATION MECH M-1
    • WUD 2019 STD DTLS - LIFT STATION MECH M-2
    • WUD 2019 STD DTLS - POTABLE WATER - PWS-1
    • WUD 2019 STD DTLS - POTABLE WATER - PWS-2
    • WUD 2019 STD DTLS - POTABLE WATER - PWS-3
    • WUD 2019 STD DTLS - POTABLE WATER - PWS-4
    • WUD 2019 STD DTLS - POTABLE WATER - PWS-5
    • WUD 2019 STD DTLS - POTABLE WATER (5 SHTS)
    • WUD 2019 STD DTLS - RECLAIMED WATER - RW -1
    • WUD 2019 STD DTLS - RECLAIMED WATER - RW -2
    • WUD 2019 STD DTLS - RECLAIMED WATER - RW -3
    • WUD 2019 STD DTLS - RECLAIMED WATER - RW -4
    • WUD 2019 STD DTLS - RECLAIMED WATER - RW -5
    • WUD 2019 STD DTLS - RECLAIMED WATER (5 SHTS)
    • WUD 2019 STD DTLS - WASTEWATER - WW-1
    • WUD 2019 STD DTLS - WASTEWATER - WW-2
    • WUD 2019 STD DTLS - WASTEWATER - WW-3
    • WUD 2019 STD DTLS - WASTEWATER - WW-4
    • WUD 2019 STD DTLS - WASTEWATER - WW-5
    • WUD 2019 STD DTLS - WASTEWATER (5 SHTS)
  • Water Quality Reports
    • 2017 Water Quality Report - Eastern
    • 2017 Water Quality Report - Glades
    • CCR2016
    • Glades Water Quality Report
    • GL-CCR2016
    • Notice.pdf
    • Spanish Glades Water Quality Report
    • Spanish Water Quality Report
    • Water Quality Report

​Download Minimum Design Standards

Page Content 1
Page Content 2
PBC Mission Statement
To drive a continuous improvement culture of excellence that achieves a measurably high level of public satisfaction.
Read More



Site Directory

  • PBCGOV.com
  • Government
  • Residents
  • Business
  • Things To Do
  • Online Services
  • Departments
  • Jobs
  • Contact Us

Useful Links

  • PBC Business Opportunities
  • Volunteer Opportunities
  • Links
  • Publications
  • Stay Connected!
  • Web Site Disclaimer
  • District Locator
  • BCC Meetings
  • Sign In

Accessibility Statement   Home   Links   Jobs   Contact Us
© Copyright 2019 Palm Beach County, FL.