​​​​​​​​​​​​

  • Road District Maintenance Crew – Roadside Shoulder Maintenance – Road Section Stormwater Operations

  • Australian and WPB Canal Fixed Bridge – Post and Rail Replacement - Bridge Section

  • Indiantown Rd - Pathway Resurface – Construction Section

  • Street Sweeping - Stormwater Operations

  • South Lake Worth Inlet Sand Transfer Plant (Boynton Beach) – Dredge Operations – Dredge Group

  • Camino Real / Boca Club Bascule Bridge - Electrical Components Troubleshoot – Bridge Section

  • Indiantown Rd – ADA Improvement – Construction Section

  • Cannongate Subdivision – Speed Hump Installation - Construction Section

  • L-2 Stormwater Pump Station - Pump Maintenance – Bridge Section Electricians

  • Roadway Right of Way Crew – Maintenance Operations – Road Section Maintenance – Bridge Section Electricians

  • Stormdrain Outfall Maintenance – Debris / Root Removal – Road / Stormwater Operations

  • Menzi Muck – Ditch Maintenance – Stormwater Operations

  • South Lake Worth Inlet Sand Transfer Plant (Boynton Beach) – Dredge Operations – Dredge / Road Operations

  • CCTV Van and Street Sweeper – Stormwater Operations

  • Trailwood Circle - Road Side Drainage Swale Maintenance – Road’s Maintenance District Operations – Road Section

  • Donald Ross Bascule Bridge Structural Inspection – A-62 Bridge Inspection Truck – Bridge Section

  • Road Side Drainage Swale Maintenance – Road’s Maintenance District Operations – Road Section

  • Ocean Ave / Lantana Bascule Bridge – Bridge Section

  • Road District Maintenance Crew – Road Patching – Road Section

  • George Bush Bascule Bridge Repair – Gear Replacement - Bridge Section

  • Jet Vactor Truck – Stormwater Maintenance – Stormwater Operations

  • “IST” Roadway Resurface Operations – Mill and Pave – Construction Section

  • Roadway Resurface Operations – Mill and Pave – Construction Section

  • Jet Vactor Truck – Catch Basin Debris Removal – Stormwater Operations

https://discover.pbcgov.org/engineering/Slideshows/Road and Bridge/Road-Bridge-7.jpg
https://discover.pbcgov.org/engineering/Slideshows/Road and Bridge/slide-1.jpg
https://discover.pbcgov.org/engineering/Slideshows/Road and Bridge/slide-10.jpg
https://discover.pbcgov.org/engineering/Slideshows/Road and Bridge/slide-11.jpg
https://discover.pbcgov.org/engineering/Slideshows/Road and Bridge/slide-12.jpg
https://discover.pbcgov.org/engineering/Slideshows/Road and Bridge/slide-13.jpg
https://discover.pbcgov.org/engineering/Slideshows/Road and Bridge/slide-14.jpg
https://discover.pbcgov.org/engineering/Slideshows/Road and Bridge/slide-15.jpg
https://discover.pbcgov.org/engineering/Slideshows/Road and Bridge/slide-16.jpg
https://discover.pbcgov.org/engineering/Slideshows/Road and Bridge/slide-17.jpg
https://discover.pbcgov.org/engineering/Slideshows/Road and Bridge/slide-18.jpg
https://discover.pbcgov.org/engineering/Slideshows/Road and Bridge/slide-19.jpg
https://discover.pbcgov.org/engineering/Slideshows/Road and Bridge/slide-2.jpg
https://discover.pbcgov.org/engineering/Slideshows/Road and Bridge/slide-20.jpg
https://discover.pbcgov.org/engineering/Slideshows/Road and Bridge/slide-21.jpg
https://discover.pbcgov.org/engineering/Slideshows/Road and Bridge/slide-22.jpg
https://discover.pbcgov.org/engineering/Slideshows/Road and Bridge/slide-23.jpg
https://discover.pbcgov.org/engineering/Slideshows/Road and Bridge/slide-24.jpg
https://discover.pbcgov.org/engineering/Slideshows/Road and Bridge/slide-3.jpg
https://discover.pbcgov.org/engineering/Slideshows/Road and Bridge/slide-4.jpg
https://discover.pbcgov.org/engineering/Slideshows/Road and Bridge/slide-5.jpg
https://discover.pbcgov.org/engineering/Slideshows/Road and Bridge/slide-6.jpg
https://discover.pbcgov.org/engineering/Slideshows/Road and Bridge/slide-7.jpg
https://discover.pbcgov.org/engineering/Slideshows/Road and Bridge/slide-8.jpg
https://discover.pbcgov.org/engineering/Slideshows/Road and Bridge/slide-9.jpg

Division Director

Adam Faustini

Assistant Division Director

Dan Doyle



Road and Bridge

Road & Bridge is responsible for maintaining all County-owned roads and bridges. Maintained areas include drainage ditches, sidewalks, pathways, & guardrails. Tasks involve, but are not limited to, developing and managing a road resurfacing program, patching potholes, operating county-owned bascule bridges, mowing rights-of-way, maintaining storm drain systems and their related drainage ditches, and operating the north and south inlet sand transfer pumping stations. 

 

Road Section
Bridge Section
Construction Section
Ditch & Pond Inventory with County-maintained Roads

 

collage of various road and bridge projects in action

 Contact Us

​Vista Operation and Support Center
2555 Vista Parkway
West Palm Beach, FL 33411-5601
Phone:  561-233-3950
 

 PBC Stormwater Division