Base Building Line Waiver
 
   Back to Land Development Page
 
Base Building Line Waiver
 Pursuant to County Engineering standards, the front, side  street and rear setback (when the rear property line abuts at street), shall be  measured from the Base Building Line (Article 3.D.1.D.1). This requirement may  be waived by applying for a Base Building Line Waiver. The below application,  supporting documentation and fee shall be submitted to the Land Development  Division for processing. If this waiver request is associated with a Building  Division permit, the BBL Waiver will be processed through that permit, and a  separate application is not required to be submitted to Land Development.   Please direct any questions by email to 
   ENG-BBL-WAIVER@pbc.gov or call 561-684-4090.